Friday, 30 January 2015

Road construction

Road construction 


In a modren time road where constructed with diffrent types and mostly used the construction of road with various method

first of all site selection of road for road .

and then site clearence
use the machinary
grader will used for the lavel of sub grade there are three type of road base .
sub base
base
topping

dry compaction of road with roller and then 4 inch thcikness of aggregate laying and compaction on this then wet compaction and 2 inch thickness of sand laying on aggregate for filling the voids of aggregate .
and then taken the camber and gradient in the road .
gradient mean the side slope of road in longutudional axix and given the camber in width of road .
then prepar the surface of road with esphalt pever .

Thursday, 29 January 2015

ROAD SURVEY AND DESIGN SPECIFICATION

ROAD survey and design specifications



This section requires that the design of the survey methodology and describes the requirements
Follady the design drawings for the construction of roads must be followed to prepare
And Bamyan city roads Project UNOPS / AGOC transport will be implemented under
Sector program portfolio.
Required design shown, but not limited to the following actions as are:
• road works, drainage, erosion control and associated site works and earthworks application
Different standards, codes and principles of road design to provide the minimum is intended as a guide
Standards for road geometric elements. Important for the development, such factors
The road to the natural shape of the vertical and horizontal alignments fitting coordination, as
Land (pasture), including the protection of natural features. In addition, consideration will be given to
Public access and safety practice.
UNOPS the BOQ, technical specification and standard drawings are to be used by the contractor.
These variations may be necessary from time to time and are to be discussed with the UNOPS
Description of the design engineer and approved before work.
Design standards and publications
Road design should conform to the following standards:
• Highways and roads, Fourth Edition, 2001 AASHTO Policy on Geometric Design (Green Book)
Rural Rehabilitation and Development (MRRD) and the Ministry • Ministry of Public Works (MPW)
Standards MRRD Standard Drawings.
• National Rural Access Program Standards.
• MPW technical specifications designed to NRAP.
• Ministry of Public Works, Transit Road Standards March, 2005
• AASHTO Guide for Design of Pavement Structures, 1993 and 1998 Supplement
• Design and Control of Concrete mix, 14th Edition
• AASHTO Highway Drainage Guidelines, 2007 Edition
UNOPS as determined by the Engineer • any other relevant guidelines and specifications

Saturday, 24 January 2015

Triangulation Survey

Triangulation Survey

Today triangulation surveying, navigation, metrology, astrometry, binocular vision, model rockets and weapons including guns direction is used for many purposes.

Used to estimate the distance of the triangle goes back to ancient times. Thales same time, the length of his shadow and by their own measure to estimate the height of the pyramid using similar triangles, and its height (intercept theorem) as compared to the percentage recorded in the 6th century BC Greek philosopher is, [1] and from the clifftop, line-of-sight to fall from a known fixed horizontal distance measurement, and scaling the mountain height of eye ships at sea estimated distance [2] such techniques are known to the ancient Egyptians. 57 Papyrus issue and found wallet, a thousand years ago, seqt defines a shield to increase the number of runs as the ratio seked, measured as the reciprocal of the gradients. Slopes and angles Greeks a dioptra, Arabic is called the forerunner of alidade that were measured using a sighting rod. Use this tool to determine a distance range of construction is known a detailed contemporary collection, which survived in Arabic translation of Alexandria (c. 10-70 AD.), The hero Dioptra; but knowledge in Europe became lost. China, Pei Xiu's I (224-271) must identify accurately set the distance for accurate mapping fifth of his six principles, as "right-angle and acute angle measurement"; [3 ] Liu Hui (. c. 263), while the perpendicular distance measurements in inaccessible places a version of the above calculation. [4] [5]

In the field, triangulation methods apparently Roman specialist land surveyors, agromensores been used by, but Ibn al-Saffar (d. 1035) by Arabic treatise on the astrolabe as, through the Middle Ages introduced in Spain a. [6] Abu Rayhan Biruni (d. 1048) introduced the technique of triangulation to measure the size of the earth and the distance between different locations. [7] simplified the Roman techniques used by professional surveyors with more sophisticated techniques seem to co-exist. To provide such methods in Latin but it was rare (a manual on geometry, Geomatria incerti author eleventh century is a rare exception), and in other parts of Europe such techniques show only slowly percolated. [6] awareness and use of such techniques in Spain, which dates from about 1300, especially for measuring the angle used by the Middle Ages, Jacob's staff can be verified; and Portolan charts oldest living accurately survey the appearance of coastline, is dated 1296.

Gemma Frisius to mapmaking and triangulation [Edit]
On the ground, cartographer Gemma Frisius of far-away places for accurately mapping the position suggested using triangulation his Libellus de Locorum describendorum ratione the new 1533 brochure as a supplement is required, which (one way of describing the locations booklet) Peter Apian's edition of the best-selling 1524 Cosmographica. It became very influential, and techniques Germany, Austria and the Netherlands spread. Astronomer Tycho Brahe 1584 the island in the production of an estate plan, the Observatory of the important landmarks on both sides of Öresund, where was based on Hven, the island in 1579 to complete a detailed triangulation, Scandinavia the method is applied. [8] In England, William Cuningham's Cosmographical glasse method of Frisius (1559), all kinds of land (1562) Leigh Valentine's measurement of the treatise, including William, which appeared in the middle of the century books on surveying was added in increasing numbers Navigation (1571), Thomas Digges geometric rules to practice Pantometria (1571), and John Norden's surveyor's dialogue (1607) called. This map features in their county of Christopher Saxton 1570s to replace the rough-and-ready that can be used for triangulation has been suggested, but from the vantage points of the key features of others to get some bearings after that, they just guesswork by their distance can be estimated. [9]

Willebrord Snell and modern triangulation networks [Edit]
In 1615 the systematic use of triangulation networks Bergen op Zoom distance from Alkmaar to the Dutch mathematician Willebrord Snell of survey work, stems from, all of the 33 triangles using a series of quadrangles approximately 70 miles (110 km). Book Eratosthenes Batavus (Dutch Eratosthenes) observed a feat in the title published in 1617, - measuring the circumference of the earth, was able to calculate a value for the two cities, separated by a degree on the meridian were doing. Snell's planar formulas to allow for the curvature of the earth can be accurately calculated how. They also, unknown cast angle between the vertices of a triangle using the position of a point in the resection, or shown how to calculate. It depends on the vertices of a compass bearings, much more than can be measured accurately. The first control point surveying a large-scale core network, and then within the core network, the main idea of locating points in the secondary subsidiary established.

Methods of France near Snell in 1669-70, Sourdon stretching north from the Clock Tower in Paris thirteen triangles using a series of one degree of latitude with the meridian of Paris to the survey was Jean-Packard . Devices and thanks to improvements in accuracy, Picard first reasonably accurate measurement of the radius of the earth is classified as. His most important work by Cassini family was extended during the next century: Jean-Dominique Cassini and his son Jacques Cassini between 1683 and 1718, the survey of the Paris meridian from Dunkirk to Perpignan. And between 1733 and 1740 Jacques Cassini and his son Caesar built on strict principles of France as a result of the publication in 1745 of the first map, the meridian arc re-surveying the entire country, including the triangulation, taken in hand.

triangulation methods are now well established for local mapmaking, but the only other countries detailed maps of the countries surveyed to establish triangulation network that began towards the end of the 18th century. Is not completed until 1853, although the United Kingdom's principal triangulation, 1783 by Ordnance Survey was launched, and eventually Mount Everest and other Himalayan peaks named and mapped in the India, the Great Trigonometric Survey, Napoleon French state began in 1801. for, after the French full of triangulation, the German Rhineland in 1801, was extended by Jean-Joseph Tranchot Prussian general Carl von since 1815 by Müffling. Meanwhile, the famous mathematician Carl Friedrich Gauss was more real- problems of large systems of simultaneous equations to find the best fit for the solution of the least squares method is developed for the triangulation of the kingdom of Hanover, as well 1825 1821 entrusted the measure

Saturday, 10 January 2015

Foundation of building

Fundation of building


The simplest Foundation, a padstone. Swedish-born Open Air Museum
Earthfast or post in the building
Buildings and structures in contact with the ground being built of wood has a long history. Technically, based on the building can be posted. To wood pilings are called grillage even marine construction and wood or steel in concrete bridge beams intersect stone or masonry walls were used on the soft or wet ground

Padstones
Probably easier Foundation padstone, both on the ground and spreads the weight of padstone ground.Staddle rocks off a certain kind of wood which raises a stone.

Foundations of Stone
Dry stone and mortar laid the foundation stone for the construction are common in many parts of the world. Dry-laid stone building foundations may have been clarified with the mortar. Sometimes the top, overlooking the course of stone, quarried stone is cut.

Rubble trench foundations
Main article: rubble trench foundation
Debris or rubble trench foundation is a shallow trench filled with stones. The grounds extend below the frost line and drain off the ground, which helps drain pipe may have. He / m² over 10 tons (2,000 pounds per square foot) are suitable for land with the ability ...

Monday, 15 December 2014

Prism

 Prism 

 

Surveying or land surveying correctly points and the distances and angles between them to determine the position of the terrestrial or three-dimensional technology, profession and science, by general practice surveyors, and members of various engineering professions . These points are usually on the surface of the earth, and they often property such as land maps and boundaries for ownership, government or civil law required by the characteristics of the building or underground level corner location , or other such places purposes, is used to set the sale.

Surveyors mathematics (geometry and trigonometry), physics, engineering and using elements of the law. Surveying equipment total stations, robotic total stations, GPS receivers, prisms's, 3D scanners, radio, handheld tablets, digital levels, and includes surveying software.

An alternative definition, Surveying and Mapping (ACSM) and the American Congress, Science, above, or below ground level points or physical and cultural details to determine the relative position of all necessary to measure is the art and described them in a usable form, or to establish the position of points or details. [Citation needed]

As alluded to above, the "land survey" is known as a particular type of surveying (also per ACSM) detailed study information collected through observation or inspection as, in the field, measurement, questionnaire, or legal instruments for research, planning, designing, and supporting the establishment of property boundaries and data analysis. Subdivision plats or maps, registered land surveys, judicial surveys, and space (as required by law or local ordinance) record and historical evidence, as well as certification surveys and land boundaries based on documents cadastral survey determination, including the re-establishment. Land surveying, mapping and related data such accumulation, construction layout surveys, precision measurements of length, angle, elevation, area, and volume, as well as horizontal and vertical control surveys, and analysis of the survey data as the use of services may include associated.

Surveying (6,000 years ago) since the beginning of recorded history in the development of the human environment is a major factor. The planning and construction process is required in almost every form. The most familiar modern uses of the transportation, building and construction, communications, mapping, and land ownership are in the definition of legal boundaries.

Sunday, 14 December 2014

Techometry surve

 Techometery survey


"immediate action" from the Greek), relative to other points on the Earth's surface, both horizontal and vertical positions without using a chain or tape are determined by the speed surveying is a system, or to a separate device.

Beautiful earth stood clear of obstructions and is not a theodolite, chain, and applying common methods of surveying tools are fairly satisfactory, but the ground is covered with bush, or once it is broken by ravines becomes extremely cumbersome. The slow and responsible enough range measurement error, leveling, too, though without serious loss of accuracy, speed is great harm in point.

Employed to mark a point in which, instead tacheometry Pole led to the introduction of these difficulties, a level similar to that of the staff used a staff. It is marked with foot heights, and the certificate in the form of tacheometer. As the previous azimuth angle is determined. Two staff well-defined points on the horizontal distance and the distance between them was known vertical angle, or a telescope diaphragm (reticle) i by two permanent stadium wires indicated by readings of staff or so is inferred. Height difference staff already achieved a certain point and the horizontal distance from depression or elevation angle is calculated. All measurements tacheometer staff to hold such a man without any help after the device are determined by an observer is the center point of where to find a point in both vertical and horizontal necessary.

Professional measurement nowadays usually done using total stations and data collectors are recorded using as Western countries, tacheometry, mainly historical interest in the survey. The location using GNSS positions are determined. Traditional methods and tools used in many areas of the world and mainly by users who are not Surveyors are still.

Saturday, 13 December 2014

Chain surveying

Chain surveying

 Gunter measure or surveyor's measure also known as) Gunter's chain used for the survey is a tool of the geodetic measurements. Gunter (1581-1626) was launched in 1620 by.

Gunter 100 links used a real measuring chain. These, China and Link, have become their own units.

Contents

      1 Description
      Method 2
      3 units of length
      4 Similar measuring chains
      5 See also
      6 References
      7 External links

Description
1 Gunter's chain = SI units
20.12 m 2,012 cm
US customary / Imperial Units
22.00 66.00 feet YD
1 Gunter link = SI units
0.2012 mm 201.2 mm
US customary / Imperial Units
0.6600 to 7,920 feet

Intermediate chain simplification measure by the brass rings marked off in groups of 10 to 100 links, is divided into. 10 links each link to slightly less than 6 feet 8 inches, with 7.92 inches are. Full length is 66 feet of chain. A square link exactly one hundred thousandth of an acre and a square one ten thousandth of China or is it 0,0404685642 m². It is about 62¾ inches square.

Measured 10 square chains to an acre Gunter system, since the entire process of measuring the traditional English measure, No. 4, and No. 10 on the basis of the decimal system based on the newly introduced: Gunter's chain of two seemingly incompatible systems decimalized calculated between chains and links, and then dividing the result by 10 acres can be replaced by [1]
Method

Gunter's chain of other parcels of land surveying a field or method first to determine the corners and other important places, and then take the two points at a time, to measure the distance between them. Chainman is assisted by a surveyor. From A stick (usually a noticeable colored wooden poles) is placed in the ground at the point of destination. The chain is laid out in the direction of the rod starting from the start point, and the surveyor then chainman to make perfectly straight chain guide and direct pointing stick out. The forward end of the series a pin is put in the ground, and it is at this point last end, and China to the destination point is extended again, so that the chain is moved forward . This process is called by, or in the US, chaining, surveyor many full length (chains) that has been placed on how the notes destination rod, is repeated until it is reached, and then the how many links in the distance being measured (a hundredth part of China) can read.

The whole process needs to be repeated for all pairs of points are others, and the land plot is a simple matter to make a scale diagram. The process is surprisingly accurate and requires only very little technology. It is at ground level and continuous-eg physical or major waterways throughout the recession, if not practicable, surveying a chain is simple. The ground plane triangulation method (slope not significantly different) requires that. On sloping ground, the chain needed undulations shown by the increase in the length or area that did not drain, an increase by the end of "leveled" had to be. [2]
Unit of length

Gunter's chain in the steel tape, (a form of tape measure) was superseded by it, the legacy of 66 feet (or 100 links) are measured the length of the chain in a new unit was. [3] This unit still exists as a British railway, as well as Australia and the United States location identifier in some areas. In the United States, for example, a two-year public land survey plats maintain the consistency of the database are published in series unit.

Other length in some places, for example in Ireland, Scotland 8.928 inch (CA. 0,227 m) and 10.08 inches (ca. 0.256 m) have been used. [Citation needed]

Just a chain length of a cricket pitch (22 yards) is. [4]
Measuring chains similar

A similar system of low popularity,, Ramsden US or China consists of 100 links engineered systems, each foot (0.3048 m) long

Less common Rathborn system, from the 17th century, two bars (33 feet, 10.0584 m) length is based on a 200 link chain. Each rod (perch) which make it ten seconds (") called 100 links, (1.98 inch, 50.292 mm each), consisting of a prime (', 19.8 inch, 0.503 m). [5]

Vincent Wing 9.90 inches links, most commonly 40 chains chains with links to 33 ft half. Sometimes these chains American colonies, particularly in Pennsylvania was used